After a leak, the surfaces dry fast while the structure stays wet. Framing, subfloors, and wall cavities hold moisture you cannot see. Structural drying uses measured airflow and dehumidification to bring those materials back to normal moisture levels.
One free call connects you with an independent local specialist. Areas served include zip codes 87035.

We are a referral line, not a contractor. Calls are routed to independent local pros around Moriarty who treat drying as a measured process with daily readings and written logs.
LGR dehumidifiers, desiccants for tough jobs, and air movers placed with purpose, not just pointed at the wall.
Daily logs track humidity and material readings so drying decisions are based on data.
Each contractor runs an independent, licensed and insured business. Confirm both with the pro before equipment is set.
You will see equipment day rates and an estimated drying timeline before setup.

Good drying starts with a moisture map and ends with readings that match dry standard. Everything in between is about controlling air, temperature, and humidity.

Pin and pinless meters plus an infrared camera show exactly where water traveled, including under cabinets, inside walls, and across the subfloor.
Sealing off the wet area with plastic focuses the equipment and shortens drying time.
Small holes behind baseboards let injection systems push dry air into wall cavities, which can avoid tearing out drywall that is otherwise sound.
Floor mat systems and targeted airflow dry hardwood and plywood subfloors slowly enough to limit cupping and cracking.
Equipment stays until wet materials match dry standard readings. The final log becomes part of your insurance file.
Tell the dispatcher when the leak happened and what has been done so far.
A local contractor calls back with an arrival time and brings meters, a thermal camera, and an initial set of drying equipment.
You get a moisture map, a dry standard baseline, and a written drying plan with costs.
Drying continues with daily monitoring until readings confirm the job is done.
Get readings before you rebuild.
A week of box fans did nothing. The pro found wet framing with infrared and dried it properly in four days.
Laura F.Hidden wet framing after leakThey drilled small holes behind the baseboards and pumped dry air into the walls. We did not have to tear out any drywall.
Kevin Y.Wall cavity dryingI liked seeing the daily log. Humidity numbers, wood readings, all of it. The adjuster liked it too.
Mariah S.Insurance drying documentationOur oak floor was cupping. They used floor mats and kept the drying slow and steady. The boards flattened back out.
Henry L.Hardwood floor drying

Most jobs take three to five days. Dense materials like hardwood, plaster, and concrete can take a week or longer.
Consumer equipment is too weak to dry framing quickly enough to prevent mold.
Dry standard is the normal moisture reading of the same type of material in an unaffected part of the home. Drying is complete when wet materials match it.
GPP is a measure of moisture in the air. Lower GPP means faster drying.
Yes. Air movers and dehumidifiers are noisy and add heat. Most people can stay home, but you may want to close doors to the drying area at night.
No. We connect you with independent local pros. Confirm their license and insurance before work starts.

Calls from Moriarty and zip codes such as 87035 are routed to structural drying pros working locally.
Nearby cities are listed below.
